The Dó-Ré-Mi Field, operated by Grupo Ubuntu, is in the process of being transferred to Mandacaru Energia. It has a development area of 11.810 km² and is located in the onshore portion of the Sergipe Basin, in the state of the same name, approximately 20 km from the city of Aracaju, its capital.
The Dó-Ré-Mi field was discovered in 2009 and is currently under development, with the expectation of producing natural gas as the main fluid.
In the development project, the production unit to be installed in the field will consist of a system for collecting, separating, and conditioning the produced natural gas, as well as compression and loading for its commercialization.
m3/day